Solar Panel Installation: The Best Installers in Your City

See which panels and inverters homeowners actually install, understand what changed with federal incentives in 2026, and find the installers that put in the most systems in your city.

129 City Rankings From installation records
233 Installer Profiles Only companies that rank
1.2M Home Systems Analyzed Utility and state records
3.8% of U.S. Homes Have Solar EIA, July 2026

Best Solar Installers by State

Pick your state to see the top solar companies in each city we rank, from public installation records.

Share of homes with solar Under 1%1–2%2–4%4–6%6–10%10% or more

New Mexico

3 cities ranked
21,269home systems, 2021–2023
6.6%of homes have solar
$4.48/Wmedian price paid

#1in Albuquerque: Solar Works Energy

Texas

2 cities ranked
22,375home systems, 2021–2023
0.6%of homes have solar
$3.83/Wmedian price paid

#1in San Antonio: Greenstar Power

Wisconsin

2 cities ranked
7,845home systems, 2021–2023
0.7%of homes have solar
$3.80/Wmedian price paid

#1statewide: Everlight Solar Construction

Connecticut

1 city ranked
18,083home systems, 2019–2021
7.7%of homes have solar
$3.70/Wmedian price paid

#1statewide: Trinity Solar

We rank installers in the 17 states where public records or city permits name the company that installed each home system. Figures cover each state's latest three years of records; the share of homes with solar is from the U.S. Energy Information Administration. For every other state, see how many homes have solar in each state.

The Panels and Inverters Homeowners Actually Install

From public installation records of home systems installed in 2021–2023 (Tracking the Sun, Lawrence Berkeley National Laboratory).

Most-Installed Panel Brands

Share of home systems by panel manufacturer, 2021–2023
Public records
Panel brand Share of home systems Note
Qcells25%The most common brand on US homes.
SunPower12%SunPower filed for bankruptcy in 2024; panel warranties depend on the manufacturer (Maxeon).
LONGi10%One of the world's largest panel makers.
REC7%
LG5%LG stopped making solar panels in 2022; existing warranties are still honored by LG.
JA Solar5%
Silfab4%Manufactures in North America.
Canadian Solar4%

Panels keep getting better: the median panel installed on homes converted 16.4% of sunlight into electricity in 2015 and 20.8% in 2023. A higher-efficiency panel fits more power on the same roof; it doesn't make each kilowatt cheaper.

Inverter Architectures Compared

Microinverters vs. DC optimizers vs. central string systems
Power Conversion
43% of home systems

Microinverters (Enphase)

Converts DC to AC directly beneath each solar module on the roof.

  • Conversion: Panel-level micro DC-to-AC
  • Shade Loss: Fully isolated (0% cascade)
  • Warranty: 25-Year Standard Manufacturer
Best for: Complex roofs, multi-angles, and partial tree shade.
38% of home systems

DC Optimizers (SolarEdge)

Panel-level optimizers paired with a high-efficiency central inverter.

  • Conversion: Module MPPT + Central Inverter
  • Shade Loss: Mitigated at module level
  • Warranty: 25-Yr Optimizers / 12-Yr Inverter
Best for: Roofs with some shade where one central inverter is acceptable.
Low Initial Capex

Central String (SMA / Fronius)

Panels wired in series directly into a single central inverter.

  • Conversion: Centralized DC-to-AC box
  • Shade Loss: High (entire string affected)
  • Warranty: 10 to 12 Years Standard
Best for: Open ground mounts and roofs with zero shade.

Federal Solar Tax Credits in 2026: What Changed

The 30% credit homeowners used to claim when buying a system (Section 25D) ended on December 31, 2025.

Buying a system (cash or loan)

No federal credit for systems installed on or after January 1, 2026. The Section 25D Residential Clean Energy Credit was terminated by the One Big Beautiful Bill Act. A quote that still subtracts 30% from the price is out of date.

Leasing or a PPA

The Section 48E credit is claimed by the business that owns the system. Homeowners can benefit from it indirectly through a solar lease or power purchase agreement, available through the end of 2027.

State and utility incentives

Not affected by the federal change. They vary by state and utility, so ask each installer which ones apply to your address.

Read the full 2026 solar tax credit guide →

Frequently Asked Installation Questions

Common questions about solar installation timelines, warranties, and contractor vetting.

Is there still a federal solar tax credit in 2026?

Not for homeowners who buy a system outright. The Section 25D Residential Clean Energy Credit — the 30% credit — was terminated by the One Big Beautiful Bill Act and does not apply to systems installed on or after January 1, 2026. What remains is the Section 48E credit, which is claimed by the business that owns the system. Homeowners can still benefit from it indirectly through a solar lease or power purchase agreement (PPA), available through the end of 2027. State and utility incentives are unaffected and vary by location.

What does "Tier-1" mean for solar panels?

Tier 1 is a list kept by BloombergNEF of panel makers whose products have been used in large bank-financed projects. It measures a manufacturer's financial track record, not the quality or efficiency of a particular panel, so treat it as one data point. What matters more for a home: the panel's efficiency, its output warranty, and whether the manufacturer will still be around to honor it. In public installation records, the median panel installed on homes in 2023 converted 20.8% of sunlight into electricity.

Are microinverters better than a string inverter with optimizers?

Microinverters (like Enphase IQ8) convert DC to AC at each individual panel, preventing a shaded or dirty panel from dropping array production. They offer max redundancy, 25-year warranties, and built-in NEC rapid shutdown compliance. SolarEdge string inverters with DC optimizers achieve higher peak efficiency (99%) and lower initial hardware cost, but feature a centralized inverter point of failure.

How long does a professional solar installation take?

Physical rooftop mounting and electrical installation usually take 1 to 3 days. However, the complete lifecycle—including initial site survey, structural engineering, municipal permitting, utility interconnection agreement, and final inspection—typically spans 4 to 8 weeks.

Does solar installation damage my roof or void the roof warranty?

No, competent installers use engineered flashing systems (such as Quick Mount PV or IronRidge) and sealants to keep roof penetrations watertight. Quality installations protect shingles from UV degradation and weather wear, and reputable contractors provide 10-to-25-year roof leak warranties.